"The Big Fitz" Detailing the
Pilot House 1
December
2001 Mainly
worked on the forward deck house this month. I did finish all major
painting on all decks, even did some rough weathering on these decks.
The weathering job is coming out better then I expected. I also
figure out how to make the railing with not much time involved. I
was not able to fined any pre-made railing of this type, so scratch
build was the only solution.
The
3 images here show what detailing has been completed. All the
antennas, radar masts, railing and deck plates are done. Just some
minor touch ups to do. The gussets for the lower railings are also
in place. These I
cut out styrene to 0.5 inch width, painted it
the tan, then cut out each gusset. This was much easier to paint
before hand then after they where in place. i then took a thin
wash of dark gray to give some depth to the railing.
You
can see how well the railing turned out. I originally had the
railing made with 0.035 rod that proved to be just a bit to thick.
Even with the 0.030 rod I ended up using, it's still not to scale.
The problem was being able to drill 0.015 size hole through a 0.030
piece of rod. Any smaller and it really gets difficult. You can get
more information on how I did this here.
The
steering pole was shaped from styrene rod, then heated and bent. I
chose not to glue this in place so it can be turned out of the way
during handling. The cables that hold it place will be glued from
one side through the pole to the other side and glued. This will
allow the cable to run through the pole to allow it swivel back
out of the way.
|